Not much has happened since my last post, but we did get all the framing, electrical and plumbing rough-in inspections, and two-third of the insulation inspection all approved. So we began installing the interior drywall.
I had found a drywall lift jack on Craig's List a few weeks back for $100 and I had put it up on a single level of scaffolding with the intention of doing the main room ceiling last week. But we took the thing down and decided to learn how to use it in the Bedroom section of the house. The process is laborious and hard on the lower back since the screws have to be done over-head. The drywall jack takes a whole lot of the work out of the job.
Tuesday, we did the wall which separates the Main room from the Bedroom section to make heating the Bedroom section easier. Now the entire Bedroom section is insulated and walled off. Until the Main room ceiling is up and insulated, that end of the house is impossible to heat and the difference between the two halves of the house is easily felt. The walls are much easier to do, but the whole thing weighs a ton. The next day brought muscle and joint pain, so we took the day off to rest up.
On Friday we put up the Bedroom ceiling. This is a bigger room so the drywall jack does the job much easier. Even though the walls aren't covered it feels like a space we will be very comfortable in. I put the lights in the ceiling, as I had in the Office, but we still needed to put a few outlets in before putting power to the room. Saturday we had errands to run so all I got done was putting in the last two electrical outlets in the Bedroom. The lights came on with the flick of the switch. Real electric lights too, like the kind people in town have! Very satisfying.
In non-Farmhouse news . . . The weather at the Farm was dry all week. Can't say it was ever warm, but not windy and wet passes for a nice day in the north-western Oregon Winter. The mud subsided a bit. The ducks dried out a the Chickens started producing eggs in a big way. Saturday we got thirty-one eggs, a new record.
We are rapidly approaching breeding season for our hounds and we will soon re-enter the breeding business. I have been accumulating a Waiting List of people wanting a puppy, so most of the first litter is likely already taken even though we have nothing to take. We will do at least two litters this year, a good thing since were beginning to see the bottom of the money bucket. We will have to do the first litter in the Farmhouse since we are still living in what will become the new kennel once the house is done. A necessary sacrifice, but the pups will have a safe dry space with a floor, walls, heat, and lights.
Lastly, the County was doing some tree trimming work on the electrical wires on Sell Road and our neighbor, Jay, had talked the crew into dropping all of the ground up trimmings onto his place. But he hadn't many places to put the stuff so on Saturday morning I warmed up Rosie the tractor and brought all that woody stuff in to make a six inch thick path from the Driveway to the Back door of the new house. The trimmings are not neat and tidy, but the mud will never get through it. Projects everywhere getting done, progress abounding at Creekside Farm.